loading

A leading professional service provider focusing on the global semiconductor distribution industry. 

Toshiba announces resumption of partial production after earthquake

    Toshiba announced on January 9 that its factory in Ishikawa, Japan, which had been shut down due to the earthquake, had resumed partial production.

Toshiba said that the production line of Kaga Toshiba Electronics Co. Ltd., a power semiconductor factory located in Nomi City, Ishikawa Prefecture, has undergone thorough equipment inspections and aims to restart some production lines before January 10, but the timetable for full resumption of operations has not yet been determined. The exhaust pipe of the clean room was extensively damaged. However, the damage to the building was not severe enough to impact production.

According to public information, Kaga Toshiba Electronics specializes in the production of power semiconductors for electric vehicles (EVs) and railways. Toshiba President Taro Shimada said that it is still difficult to determine the losses caused by the suspension of production and the impact on shipment plans.

prev
SIA: Semiconductor sales up 5.3% year-on-year in November 2023
Nvidia and AMD are expected to ship 1.5 million AI chips in 2024
next
recommended for you
no data
GET IN TOUCH WITH Us
A leading professional service provider focusing on the global semiconductor distribution industry. 
Contact Us

Manager:  Mio Zhang
TEL:0755-88377560
Email:sales1@iccpower.com
WhatsApp/ Phone number: +8613677477773  

Adress:4C, Building F-2, Xiufeng Industrial, Gankeng Community, Jihua Street, Longgang District, Shenzhen city China

Copyright © 2025 Shenzhen Shenming Electronic technology Co., Ltd  | Sitemap
Customer service
detect